The reconstruction and extension of the existing logistics center for Mercedes-Benz Polska involved the construction of an additional warehouse (14,430 m²), service and staff premises (669 m²) and a free-standing waste shed (900 m²), as well as the expansion of the existing infrastructure (networks, surfaces and green areas). The general constructor’s tasks also included the removal of underground technical infrastructure and the demolition of sections of the traffic system that collided with the extension. Kajima also coordinated all construction works with the customer’s schedule of deliveries to the operating part of the distribution center.

As required by the customer, the sprinkler system in the hall and the water pipe for the sprinkler and hydrant systems were made in accordance with the FM Global requirements. All works were carried out in accordance with the customer’s stringent standards regarding the quality of works and occupational health and safety rules.

Mercedes, extension of logistic center / Ołtarzew

Client: Mercedes-Benz Polska
Execution period: 2018-2019
Scope of work: building permit design, execution design, general contracting
Location: Ołtarzew, Poznańska 345 St. (Ożarów Mazowiecki)
Total area: 15,099 m²