DC1 Distribution Center with a total area of 36,700 m² consists of a warehouse part and a staff and office part. As part of the “design & build” service, Kajima Poland has carried out all works, including earthworks, construction works and finishing works, and has installed networks and systems. For the hall to operate, 23,000 m² of roads, maneuvring areas for heavy traffic, and pavements have been built. In order to streamline traffic around DC1, Kajima Poland has rebuilt the roundabout at the junction of A-1 motorway and has built a local access road (500 m). Kajima has also prepared the entire facility for BREEAM certification with a Very Good rating. The sprinkler system and the smoke extraction system are compliant with NFPA 12 and NFPA 13 standards.

7R, DC1 distribution center / Łódź

Client: 7R SA
Execution period: 2021
Scope of work: replacement building permit design, execution design, general contracting, BREEAM
Location: Łódź, Brzezińska St.
Total area: 36,700 m²