Construction of the DC3C hall for an international logistics operator. The task of the general contractor was to adapt the existing hall, add a new DC3C hall and adapt the whole to the needs of the future user, who previously occupied the adjacent hall. Two mezzanines, technological equipment, high storage racks and the tenant’s IT installation had to be moved from the previous location. All construction, reconstruction and relocation works were carried out during the tenant’s continuous logistic activity. The general contractor’s task was therefore to ensure continuous communication between the offices and the hall (old and then new). The same requirement applied to the transfer of offices to the new building. In total, he area covered by all works related to the construction and adaptation of the DC3C hall amounted to 18,756 m². The DC3C hall is BREEAM Good certified.


Construction of the DC2B hall for an international logistics operator. The building has merged the separate halls into one large building. The area of the link was 2,637 m².

Prologis Park Szczecin, DC3C and DC2B / Goleniów

Client: Prologis Poland Reit
Execution period: 2017-2018
Scope of work: building permit design, execution design, general contracting, BREEAM
Location: Goleniów, Prosta 16 St.
Total area: DC3C: 18,756 m², DC2B: 2,637 m²