Construction of a rubber hoses production plant with infrastructure for Gates Polska. The completed investment consists of a production hall with a warehouse for finished products (approx. 24,100 m²), a two-storey office part (1,500 m²), a laboratory (700 m²), technical buildings and necessary infrastructure. In addition to the construction of buildings belonging to the plant, Kajima’s work included the relocation of the existing rainwater and sanitary sewer networks, serving the Legnica Special Economic Zone, without stopping work in the adjacent production plants. It was also necessary to bring the process installations to the plant and prepare them for the assembly of production machines. While performing its work, Kajima’s team had to follow the extremely demanding procedures of the Client concerning the quality of works  undertaken and health and safety at work.

Gates / Legnica

Client: Gates Polska
Execution period: 2017-2018
Scope of work: replacement executive design (structure, architecture), construction project, general contracting
Location: Legnica, Jaworzyńska 301 St.
Total area: 26,300 m²