{"id":8010,"date":"2025-03-19T09:49:41","date_gmt":"2025-03-19T08:49:41","guid":{"rendered":"https:\/\/kajima.pl\/realizacje_post\/frigo-logistics-distribution-centre-with-freezer-rooms-nowy-dwor-mazowiecki\/"},"modified":"2026-03-27T14:51:36","modified_gmt":"2026-03-27T13:51:36","slug":"frigo-logistics-distribution-centre-with-freezer-rooms-nowy-dwor-mazowiecki","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/frigo-logistics-distribution-centre-with-freezer-rooms-nowy-dwor-mazowiecki\/","title":{"rendered":"Frigo Logistics | Distribution Centre, Nowy Dw\u00f3r Mazowiecki"},"content":{"rendered":"\n
The modern Frigo Logistics Distribution Centre is designed for the warehousing distribution service of frozen food products. It consists of three freezer buildings connected by transport locks: an automatic High-Bay Warehouse (over 36 m high), a Distribution Warehouse and Expedition Zone. The project also includes a comfortable, air-conditioned, three-story office building with a lift and several technical facilities, including a machine room serving the freezer rooms.<\/p>\n\n\n\n
Due to its specificity, the project is technologically complex and based on unusual solutions in the field of construction technique and cooling technology. It is equipped with, among others, a cooling system with ammonia as a cooling agent (down to -24O<\/sup>C), a glycol-based heating system to heat the ground under the freezer rooms (the heat for heating is recovered from the freezer room cooling process), a system reducing the oxygen level (High-Bay) and a hot water system where water is heated by solar panels (office building). The complex of three reduced-temperature buildings has three separate fire zones.<\/p>\n","protected":false},"featured_media":7990,"menu_order":0,"template":"","realization_type":[28],"class_list":["post-8010","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n