{"id":666,"date":"2020-02-05T13:03:39","date_gmt":"2020-02-05T12:03:39","guid":{"rendered":"https:\/\/kajima.pl\/realizacje_post\/prologis-park-wroclaw-v-dc8b-nowa-wies-wroclawska\/"},"modified":"2026-03-27T10:19:01","modified_gmt":"2026-03-27T09:19:01","slug":"prologis-park-wroclaw-v-dc8b-nowa-wies-wroclawska","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/prologis-park-wroclaw-v-dc8b-nowa-wies-wroclawska\/","title":{"rendered":"Prologis Park Wroc\u0142aw V (DC8B), Nowa Wie\u015b Wroc\u0142."},"content":{"rendered":"\n
DC8B Distribution Centre in Nowa Wie\u015b Wroc\u0142awska consists of a warehouse and logistics hall (15,516 m\u00b2), a two-storey office and social part (431 m\u00b2) and the necessary infrastructure. The scope of work included turnkey construction of the facility as well as connection of all installations, networks and surfaces with the infrastructure of the DC8A hall, with which the new facility is one cubic capacity. The construction took place during the operation of the DC8A hall and the entire logistics park, so it was necessary to ensure that its tenant maintained the liquidity of deliveries and collections of goods. The facility has a BREEAM Good certificate<\/strong>. <\/p>\n","protected":false},"featured_media":7825,"menu_order":66,"template":"","realization_type":[28],"class_list":["post-666","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n