{"id":4305,"date":"2022-07-26T17:13:36","date_gmt":"2022-07-26T15:13:36","guid":{"rendered":"https:\/\/kajima.pl\/realizacje_post\/panattoni-park-ruda-slaska-iii-hala-a\/"},"modified":"2026-03-27T10:30:26","modified_gmt":"2026-03-27T09:30:26","slug":"panattoni-park-ruda-slaska-iii-hall-a","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/panattoni-park-ruda-slaska-iii-hall-a\/","title":{"rendered":"Panattoni Park Ruda \u015al\u0105ska III (Hall A)"},"content":{"rendered":"\n
Hall A with a total area of 46,000 sqm, with 4,170 sqm of office and staff space, is part of the Panattoni Park Ruda \u015al\u0105ska III logistics complex. The hall has been constructed in accordance with the client\u2019s and tenant\u2019s specifications and is adapted to production, storage, and logistics tasks. <\/p>\n\n
The general contractor was responsible for the construction of the entire Panattoni Park Ruda \u015al\u0105ska III logistics complex in the design & build model, as well as its preparation for the multi-criteria BREEAM certification with a Very Good rating. To prepare the ground for the construction of the park the impulse compaction method was used and a crushed stone layer of material obtained from excavation within the same plot was made.<\/p>\n","protected":false},"featured_media":4353,"menu_order":0,"template":"","realization_type":[28,29],"class_list":["post-4305","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n