{"id":4031,"date":"2021-12-10T12:03:00","date_gmt":"2021-12-10T11:03:00","guid":{"rendered":"https:\/\/kajima.pl\/?post_type=realizacje_post&p=4031"},"modified":"2026-03-27T10:22:50","modified_gmt":"2026-03-27T09:22:50","slug":"nestle-purina-phase-6-nowa-wies-wroclawska","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/nestle-purina-phase-6-nowa-wies-wroclawska\/","title":{"rendered":"Nestle Purina (Phase No. 6), Nowa Wie\u015b Wroc\u0142awska"},"content":{"rendered":"\n
As part of the 6th<\/sup> Phase of the expansion of the Nestl\u00e9 Purina production plant, a production and warehouse building (10,068 m\u00b2 \u2013 a production facility and intermediate warehouses), FERT \u2013 a final dispatch warehouse (5,268 m\u00b2), DEPAL \u2013 a packaging warehouse and quality control rooms (1,011 m\u00b2), as well as technical buildings and rooms were completed.<\/p>\n\n\n\n Kajima Poland performed land development along with networks and surfaces, construction and finishing works, as well as part of the systems (lightning protection, sprinkler system, and under-floor systems, including the technological one). The design was coordinated in the Building Information Modelling (BIM<\/strong>) system. The facility recovers heat generated in the production process to heat staff rooms and offices in this part of the plant.<\/p>\n\n\n\n During the expansion, it was necessary to accommodate the very high client requirements regarding occupational health and safety as well as hygiene standards. Ongoing coordination of the entire construction process was also required so as not to obstruct work in the operational part of the plant.<\/p>\n","protected":false},"featured_media":4444,"menu_order":0,"template":"","realization_type":[29],"class_list":["post-4031","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n