{"id":2094,"date":"2020-02-05T12:23:53","date_gmt":"2020-02-05T11:23:53","guid":{"rendered":"https:\/\/kajima.pl\/realizacje_post\/haerter-rozbudowa-legnica\/"},"modified":"2022-12-05T15:22:54","modified_gmt":"2022-12-05T14:22:54","slug":"haerter-rozbudowa-legnica","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/haerter-rozbudowa-legnica\/","title":{"rendered":"Haerter (ext.), Legnica"},"content":{"rendered":"\n
The expansion of the production plant for assembly units as well as stamped and formed parts, with a production and warehouse part (4,674 m\u00b2), an office and staff part (250 m\u00b2), a chemical warehouse and a lock building (120 m\u00b2). The total area of the expanded part was 5,100 m2<\/sup>. Kajima prepared an executive design and completed all earthworks as well as installation and finishing works. Kajima was also responsible for the construction of this plant in 2005.<\/p>\n","protected":false},"featured_media":409,"menu_order":132,"template":"","realization_type":[29],"class_list":["post-2094","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n