{"id":2087,"date":"2020-02-05T12:15:15","date_gmt":"2020-02-05T11:15:15","guid":{"rendered":"https:\/\/kajima.pl\/realizacje_post\/electrolux-rozbudowa-olawa\/"},"modified":"2026-03-27T08:33:03","modified_gmt":"2026-03-27T07:33:03","slug":"electrolux-rozbudowa-olawa","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/electrolux-rozbudowa-olawa\/","title":{"rendered":"Electrolux (ext.), O\u0142awa"},"content":{"rendered":"\n
The extension of the Electrolux Poland washing machine manufacturing plant by an additional manufacturing and assembly part (16,000 m\u00b2 in total), staff and technical part (767 m\u00b2 in total), new waste shed (450 m\u00b2) and the necessary underground and road infrastructure. Due to the mounted overhead crane with a lifting capacity of 125 kN, the structure and foundations of the new part of the hall have been adequately reinforced. The extrusion presses installed in the hall required the construction of special separate foundations. Kajima also made access ways to the process systems.<\/p>\n","protected":false},"featured_media":2523,"menu_order":128,"template":"","realization_type":[29],"class_list":["post-2087","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n