{"id":2062,"date":"2020-02-05T11:51:07","date_gmt":"2020-02-05T10:51:07","guid":{"rendered":"https:\/\/kajima.pl\/realizacje_post\/cadbury-wedel-wroclaw\/"},"modified":"2026-03-27T08:33:32","modified_gmt":"2026-03-27T07:33:32","slug":"cadbury-wedel-wroclaw","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/cadbury-wedel-wroclaw\/","title":{"rendered":"Cadbury Wedel, Wroc\u0142aw"},"content":{"rendered":"\n
The extension of the chocolate production plant included the relocation of the existing sewer networks and process systems from the area of the planned extension, construction of a production and administration building (production: 16,000 m\u00b2, offices: 3,200 m\u00b2), chocolate tank building (approx. 300 m\u00b2), storage part (500 m\u00b2) and smaller technical buildings (pumping station, chiller building), as well as the construction of new infrastructure (rainwater discharge, fire protection, water supply, processes, gas supply, roads and external squares) and landscaping. Kajima\u2019s tasks did not include electrical works. For maintaining a high standard of occupational health and safety during the construction Kajima was awarded a distinction in the Safe Construction competition<\/strong> (organizer: National Labor Inspectorate)<\/p>\n","protected":false},"featured_media":383,"menu_order":175,"template":"","realization_type":[29],"class_list":["post-2062","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n