{"id":2049,"date":"2020-02-05T11:21:55","date_gmt":"2020-02-05T10:21:55","guid":{"rendered":"https:\/\/kajima.pl\/realizacje_post\/obram-tetra-park-tomaszkowo\/"},"modified":"2026-03-27T08:28:58","modified_gmt":"2026-03-27T07:28:58","slug":"obram-tetra-park-tomaszkowo","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/obram-tetra-park-tomaszkowo\/","title":{"rendered":"Tetra Pak, Tomaszkowo"},"content":{"rendered":"\n
A production plant for Obram (Tetra Pak Group) \u2013 a manufacturer in the food industry. As part of the contract, Kajima Poland developed the execution design of steel structure and reinforced concrete structure. It also executed complete earthworks (including ground reinforcement with DSM columns) and construction works, prepared paved areas (roads, parking lots, maneuvering areas (a total of approx. 12,800 m\u00b2), installed the systems and carried out finishing works. The plant has a three-storey office and staff building (3,818 m\u00b2) and a production hall (8,048 m\u00b2). <\/p>\n","protected":false},"featured_media":3354,"menu_order":110,"template":"","realization_type":[29],"class_list":["post-2049","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n