{"id":2029,"date":"2020-02-05T10:37:10","date_gmt":"2020-02-05T09:37:10","guid":{"rendered":"https:\/\/kajima.pl\/realizacje_post\/essity-rozbudowa-olawa\/"},"modified":"2026-03-27T08:29:37","modified_gmt":"2026-03-27T07:29:37","slug":"essity-rozbudowa-olawa","status":"publish","type":"realizacje_post","link":"https:\/\/kajima.pl\/en\/realizacje_post\/essity-rozbudowa-olawa\/","title":{"rendered":"Essity, O\u0142awa"},"content":{"rendered":"\n
Expansion of the hygienic agents production plant (absorbent products for children and adults) for Essity Operations Poland (part of the global brand Essity, related to hygiene and health care). The plant was extended by a production hall PH3 (5331 m\u00b2), office building (352 m\u00b2), warehouse hall RM3 (5388 m\u00b2), cloakroom-connector (263 m\u00b2) and accompanying infrastructure. Apart from the basic scope of construction, the general contractor’s tasks also included coordination in the scope of design and execution of process installations (installations for the transport of diapers, ice water, glycol recovery, ventilation for technological lines, as well as technological piping). The extension was carried out during the production activity of the plant. <\/p>\n","protected":false},"featured_media":379,"menu_order":122,"template":"","realization_type":[29],"class_list":["post-2029","realizacje_post","type-realizacje_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n