Hall A2 is composed of warehouse and office and social area. The warehouse part is made of steel construction and lightweight housing. The two-storey office building adjacent to the hall is made of brick construction. It has a façade with varied stone cladding and façade steel panels. References available.

Europa Park, Hall A2 / Mszczonów

Client: Europa Distribution Center Sp. z o.o.
Execution period
: 2003-2004
Scope of work: general contracting, executive design
Location: Mszczonów, Tarczyńska Street (the Europa Park Logistics Park in Mszczonów)
Area of the plot
: 28,221 m²
Building space (hall + office): 13,377 m²

Author of design: S.A.M.I. Architekci Sp. z o.o.

Hala A2 / Mszczonów

Europa Park, Hall A2 / Mszczonów

Storage hall A2 consisting of a warehouse part and an office-social area. The warehouse is made from a steel structure and light housing. Adjacent to the hall, the two-story office building is made from masonry construction. It has a varied façade made of stone linings and elevation steel plates. References.

Client: Europa Distribution Center Sp. z o.o.
Execution period: 2003-2004
Scope of work: general contracting, executive design
Location: Mszczonów, Tarczyńska Street (the Europa Park Logistics Park in Mszczonów)
Area of the plot: 28,221 m²
Building space (hall + office): 13,377 m²
Author of design: S.A.M.I. Architekci Sp. z o.o.

Hala A2 / Mszczonów